U.S. 331 - Construction Photo Gallery
Please click on an image below to see a larger version.
 | An aerial view of U.S. 331 before traffic was shifted to the new northbound travel lanes at the end of June 2009. |
 | An aerial view of the U.S. 331 construction project near the north end of the project, the southern end of the Clyde B. Wells Bridge. |
 | An aerial view of U.S. 331 near the U.S. 98 intersection in June 2009. |
 | The construction team used a milling machine to remove old asphalt and rebuild the roadway at the U.S. 98/331 intersection. |
 | A rolling machine was used to compact the soil in preparation for placing asphalt on the U.S. 98 westbound right turn lane onto U.S. 331 northbound. |
 | Paving crews place the last lift of structural asphalt on the new U.S. 331 northbound lanes just north of Sherriff’s Drive. Before the project is completed, paving crews will lay the final layer of friction course. |
 | Looking north along U.S. 331 from South Walton High School. New curb and gutter is in place on the east (right) side of the roadway. |
 | A new sidewalk now parallels U.S. 331. It will allow for pedestrian traffic in the area. |
 | Construction crews extended the box culvert, or drainage structure, that crosses beneath U.S. 331 just south of North Greenway Trail. |
 | Concrete curbs are constructed using a special machine that saves time and money. |
 | Workers place sod along the east side of the highway to help prevent erosion. |
 | After constructing the concrete curb along the new roadway, workers ensure that it is level. |
 | Large diameter drainage pipes and structures have been installed alongside U.S. 331 improving drainage in the area. |